Class III county road with two traffic lanes. A total of approximately 24.4 km was designed entirely along the existing route, including:
DJ 151B, crossing both urban and rural areas of the localities of Ungheni, Cerghizel, and Cerghid: approx. 12.3 km.
DJ 142, crossing both urban and rural areas of the localities of Târnăveni, Seuca, Gănești, Abuș, and Mica: approx. 12 km.





